The First Designs are In!

About a week ago, I met with Build to review their first design concepts. Build presented two separate concepts based on the pre-design meeting we had two weeks prior.

Overall, I have to say that I am thrilled with the progress. Both designs exhibit the exact design esthetic I’m looking for, while differing enough in their floorplans to present a great set of options for moving forward. I can’t stress enough the importance of hiring an architect who will show you full 3D renderings at design stage. You just can’t get a great feel for what a house is actually going to look like from a few two-dimensional schematic drawings. Below are some samples from the documents provided by Build:

Model 1

View from northwest of the house. This is the “back” of the house, but it’s the side that faces west, towards the huge view.

View from the lower lawn, looking up at the house.

View from above. Only birds will see this, but it’s a good shot to envision how a rooftop deck might look atop the flat part.

A proposed floorplan. Note that the stairwell is against the view glass and is intended as a bit of a centerpiece design element. It would certainly make walking downstairs a huge pleasure.

Sample elevations from all sides.

Model 2

View from above of the second model. Not nearly as nice looking as the first model, but more open.

Floorplan of the second model. Much closer to what I’m looking for than what was presented with the first model.

Thoughts on the two models

My overall impression is fairly straightforward: I like the exterior of Model 1 better and the interior of Model 2 better. I love how the rectangular structure in Model 1 breaks up the exterior of the house so it’s not so imposing looking, but I like how Model 2 puts all the bedrooms on the upper level (crucial for resale) and puts the living and dining rooms where I imagined they’d be all along.

We’re going to meet again this coming Friday at which point, Build will present a revised comp based on my thoughts and direction. The e-mail I sent them is below:

Hi guys. Great meeting today. I’m really excited by the direction and progress. Here are my thoughts:

Overall

The overall design aesthetic is more or less exactly what I’m looking for. You guys nailed that. Shed roof, not gigantic or overbearing, mid-century modern design cues, and open. As long as we pick the right exterior materials, this thing is going to perfect from the outside. Plenty modern, but timeless as well, without any elements that would scare off another owner (if god forbid, I ever had to sell).

Plan 1 vs. Plan 2

It’s probably best to start with Plan 2 and make modifications from there, merely because the interior layout seems much closer to what we’re looking for: three bedrooms on the upper.

Detailed Impressions

– There were only a few things I liked better about Plan 1, the most important being the breaking up of the north and south *exterior* sides with the beautiful wood rectangular thingie (BWRTâ„¢). I think that even if there is no interior function to the BWRTâ„¢ (e.g. to house the stairwell), it should be part of the house as an exterior design element. Probably front and back. It could be more subtle or shaped differently if need be, but I really like how it breaks things up from the outside.

– In order to create more room on the upper level, I think the double-heightness of the great room can be substantially narrower north-to-south. In other words, if you’re looking at the 3D view of Model 2 facing east, it has “5 panes worth of double-height” (Model 1 has 4). I think it could even be 3.25 panes worth, especially if we extend the great room eastward for the TV-watching area. If we go with 3.25 panes worth, the master (or a sitting area of the master) could extend into the previously double-height space (like in my model) or that space could be used for something else entirely. Basically, the double heightness could end right around where line C is in your schematic of Model 2.

– Building on the previous point, given that TV watching (and eating while TV watching) is a very common activity for us, we should probably start optimizing for that a bit. My initial feeling is that it should be in the southeast corner of the main floor since that would place it within eyesight of the great view but also potentially shielded from the glare by a half wall. Considering how far away from the west windows it would be, you might not even need a wall. If we place the TV room/space here, I would want the TV to be on the north or south wall. The other option that just occurred to me would be to put it in the north wing where the dining room currently is. This may actually be kind of nice considering the Nana Wall and the outdoor BBQ would be very useful during football and other parties that involve watching stuff on TV. If we put the TV room/space here, I’d want the TV on the south wall (where the pantry is now). As I look at it, this might be kind of cool because if you’re sitting on the couch facing southward watching TV, you may have a nice wide open view SSW through the house.

– The dining room feels right where you have it in Model 2. If the TV room/space ends up going there instead, the dining room could either go in the southeast corner or it could go in the “north living room” area where the extra couches and chairs are in Model 2.

– The kitchen should ideally serve the dining room, the TV room/space, and the living room. This isn’t a requirement or anything, but I’ve found that during parties, a lot of people tend to congregate in or around the kitchen so it would be cool to have it somewhat centrally located. That is kind of why it felt like putting it in the north living room area might be nice. I don’t want the location of the kitchen to cause us to compromise on the rest of the space though so don’t kill other spacing concepts for the sake of “no matter what” putting the kitchen in the north living room area. If it doesn’t work there, it doesn’t work there.

– It is not necessary for the wall north of the north living room to be glass. In fact, it might even be a disadvantage considering I want the outdoor BBQ against that wall. I really don’t think the view to the north is anything special from the main floor. I’d rather concentrate on maximizing that view angle from the top floor.

– I have no strong feeling about the stairs at this point. Use your judgement where they should be.

– I assume this is just because we’re still in rudimentary modeling stage, but none of the windows look like they open or could take screens. I assume at least some of the upper level windows in the great room will open and have screens.

– I don’t think we should be afraid of mixing some flat roof with some tilted roof. Maybe the north roof becomes flat to accommodate a deck and hot tub.

– I love the “open to below” element from the upstairs. Very cool. Would like to keep this if possible.

– If we narrow the double-height portion as mentioned above, maybe the BWRTâ„¢ is what gets wider and maybe that’s our rooftop deck and hot tub area? That might be kind of dope, and it would allow the north and south roofs to continue to be sloped. If the BWRTâ„¢ gets too overbearing if it is made that wide, maybe it becomes a floating BWRTâ„¢ instead. Imagine chopping off the bottom half of it essentially and have it only cut through the house from the second level on up. Just a thought… might not be a good idea.

Guiding the Design Process with SketchUp

The 3D Connexion Space Navigator

I’ve mentioned Google SketchUp before as the only 3D modeling application I could wrap my brain around. Even as a professional designer who has used Photoshop, Illustrator, and a host of other applications for over 10 years, all other 3D and CAD programs are just way too complicated for me.

The great thing about SketchUp — besides the fact that you can learn it in a day or two — is that it helps you figure out in your own mind what you want your new home to look like and produces great models that you can e-mail to your architects for guidance. I’ve never had a problem expressing myself with words, but when I met with my architects a couple of weeks ago to go over pre-design concepts, I found myself sketching clumsily on vellum paper and trying to artfully explain in words what could be expressed in about five seconds with a 3D mockup. After the meeting, I went home, spent a couple of hours in SketchUp, and produced the following model:

A view of the back of the house. This would be the side facing Puget Sound.

Is it pretty? Nope. But it illustrates several important concepts I wanted to get across:

  • Double-height great room on the south side
  • Nana Wall on the northwest side connecting the dining room to the deck
  • General bedroom arrangement with a deck facing northwest from the master
  • Plenty of glass
  • Stained wood siding but only used sparingly

None of these things are meant to prescribe exactly what the house will look like, but it’s invaluable to be able to put something like this in front of your architects with only a few hours worth of work. I have another meeting with them tomorrow and they could either match the model closely or go off in another direction entirely and either could work out great, but with this model, I can at least compare their solution(s) with something that I think would work for me. I made sure to tell them not to take any style cues of the admittedly rudimentary model, but only general layout cues. We’ll see what happens. I’m excited.

While we’re talking about SketchUp, I thought I’d mention a SketchUp companion product you might want to purchase if you plan on spending a lot of time in the program. It’s called the 3D Connexion Space Navigator and it’s essentially a three-dimensional mouse which lets you zoom, pan, rotate, and orbit your model by moving your hand in a three-dimensional motion. It’s bizarrely effective and it saves you from having to constantly switch between tools in SketchUp just to view your model from the right perspective for the task you’re working on. The thing is as heavy as a large paperweight, which is necessary because in order to pan up, you actually pull up vertically on the device, and to zoom out, you push it away from you. If it was light, it would move all over your desk, but since it’s so heavy, it stays in place as you exert light amounts of force on it. Really, really cool. I got mine at Amazon.com for $57.97 including shipping and tax. Props to my buddy Danny over at Mavromatic for suggesting this.

Costs accrued during this stage:

3D Connexion Space Navigator 3D Mouse$57.97

Remodel or Build from Scratch?

When you buy a property with an existing house on it, you have several choices ahead of you. You can:

  1. Move right in and accept the house as is.
  2. Do a classic “remodel”, putting in new floors, carpeting, bathroom fixtures, and/or kitchen appliances.
  3. Tear the whole thing down and start from scratch.
  4. Tear 99% of the thing down, start almost from scratch, and call it a remodel.

Options a and b are pretty straightforward and if your house already has a great footprint and layout, you probably don’t need to think about c or d. But what if you need to completely reinvent the property? What is the best way to accomplish a total transformation with as little friction as possible?

In the United States and other countries with similar building conventions, it’s usually option d. All cities are slightly different, but generally if you keep even a single wall up, it officially counts as a “remodel”. I’ve even heard stories of people keeping a tiny portion of an existing wall up, calling an inspector out to bless it, and then knocking the wall down and rebuilding it within 24 hours.

If you get your project blessed as a “remodel” by your city’s planning department, you save yourself a lot of extra permitting, extra costs, extra arguments with the city and/or neighbors, and extra time. You’re also more likely to get special “out of code” allowances from the city if you need them. For instance, the carport in my current structure does not conform to code anymore (it’s too close to the street) and the western-most edge of the house is technically in an environmentally critical zone. If I built from scratch, the chances of getting approval to re-create these out-of-code elements would be small.

Analyzing the First Pre-Design Concepts

On Friday, I went in to Build to look at some initial “pre-design” work. What is pre-design work? Well, it’s mainly an attempt to apply some loose parameters to the project before actual schematic work begins. Things like:

“Should the garage stay where it’s at, or do you feel strongly about moving it?”

“Do you feel strongly about the location and bearing of the master suite?”

“Would you prefer the great room to be completely open or do you envision separator walls dividing the space a bit?”

To help answer these questions, Build drew up this matrix of four such questions and three possible answers to each question:

By seeing this matrix illustrated above, I was able to more clearly form opinions about what I like and what I don’t. Although it doesn’t come close to answering every design question, it doesn’t aim to. It’s designed solely to cast the boat off in the right direction.

As a further exploration of the above drawing, Build produced three rough concepts, each using a different permutation of the options above. The results are below:

I can’t say I want my house to look entirely like any of these three concepts, but seeing them drawn out helped solidify my opinions about the four questions and then some. Particularly, I’ve decided that:

  • The garage should stay where it’s at, on the south end.
  • The master suite should probably be in the middle, or the north.
  • The west facade should use integral columns and be as open as possible.
  • No decision on the horizontal separation of public and private space yet, but leaning towards a vertical separation.

In addition to that, the drawings solidified my opinion that the great room should be double-height and at the southwest side of the house.

All in all, a very useful meeting! So far so good!

New House, New Junk Mail: How to Opt Out

Within a few weeks of buying a new house, you should start receiving mountains and mountains of new junk mail thanks to the fact that you’re now considered “fresh meat” to a lot of marketing and mortgage companies. There appears to be good news and bad news about getting off of these mailing lists.

The good news is that you can opt out of most of them by spending two minutes filling out a couple of quick forms on only two sites. The bad news is that mortgage offers, specifically, seem to be immune to the opt-out lists. The reason is that when you take out a mortgage, your mortgage information is part of the public record, and solicitors routinely cull these records in order to generate leads for their mortgage refinance businesses. On the bright side, quantity of mortgage junk mail seems to start out high and then taper off as your loan becomes less and less fresh.

You might as well do what you can though by opting out of both direct marketing mail and also pre-screened credit solicitations:

DMAChoice.org gets you out of the former, and OptOutPrescreen.com gets you out of the latter.

Survey Completed

The day after the deal closed, I called a few surveyors to see who charged a reasonable fee and could come out to the property in short order. It turns out they are all in the $3000 range, but some of them will charge you an hourly fee with a “not to exceed” number (better). I ended up going with Brent Eble and Emerald Land Surveying, Inc. who were able to come out to the property the very next day and charged an hourly rate with a not-to-exceed number of $2900.

Three weeks later (today), I received my survey drawings and 3D CAD file with a total bill of $2695. Not bad. I’ve already forwarded the file onto my architects and they told me everything looks great, but unfortunately, I am not able to easily import the CAD file into SketchUp. I plan on mucking around with some design ideas in SketchUp, so it’s a bit disappointing that the surface mesh the surveyor provided doesn’t seem to work very well in the only modeling app normal people like me can use. It imports, but as a series of lines instead of a true, clean surface mesh. I’ve already tried to re-convert the .dwg file from AutoCAD and ArchiCAD but since I don’t know those apps very well, I’m not making a ton of progress.

Anyway, the important part is that the survey is now done so the architects can get going on the designs.

Good old-fashioned drawings from the surveyor.

Costs accrued during this stage:

Survey$2,695.00

Architecture Contract Signed

Alright, Build LLC and I are now officially signed up to build a house together. It feels great to have such an important part of the process taken care of.

One of the nice things about Build is that Kevin Eckert and Andrew van Leeuwen — the principals — are very transparent about how long things will take and how much they will cost. When I went in to sign the contract with them, Kevin gave me a spreadsheet of where all time and money was expected to go, even though we were going with a flat-fee structure of $48,000. I won’t list every line item in the document, but the main sections are as follows:

  • Information Gathering and Documentation: $3,220 (42 hours)
  • Schematic Design and Design Development: $29,440 (370 hours)
  • Construction Documents: $10,430 (126 hours)
  • Pre-construction Services: $800 (8 hours)
  • General Conditions: $2790 (30 hours)
  • Contingency: $1,500

All of that adds up to $48,000, which I will be paying as I go, every month. The initial deposit, which I will pay today is $9600.

Costs accrued during this stage:

Architecture services$48,000.00

Picking an Architect

Although I’ve spent a bit of time over these last several months researching and interviewing architects, the complexity of picking a firm didn’t hit home until I realized how different each one is from the other. Being a designer myself, I felt a rapport with almost all of the 8 firms I talked to, and I had even “soft settled” on one of them for a couple of months, based mainly on how much I like the principals personally and how great their portfolio was.

As the prospect of building became more and more certain though, I felt I still had some homework to do, specifically around the subject of pricing. High end custom home architects have an awful reputation for designing without cost consciousness in mind. I’ve talked to people who’ve gone through it first-hand as clients as well as other people in the construction industry and most seem to agree that although architects are very important to the process of building a house, most are not overly concerned with building you a nice house as economically as possible, but rather building the most impressive house they can, with overspending as the main by-product. I know not all architects are this way, but from personal accounts, I also know that many are, and that’s why I have to be extra careful. Since I don’t want to spend a million dollars on construction, finding the most cost-effective high end architect has quickly become the most important part of this project.

Following is everything I’ve learned about architects over the last several weeks:

→ Read the rest of this entry

Day Zero

Alright, as of a couple hours ago, the funds are wired, the title is recorded, and the property is officially mine!  This is day zero.  Tomorrow begins the long, but hopefully fun process of building this place out.

Now that it’s officially on, I’m off to backfill and pre-date some blog entries which describe the process up to this point. But this day — day zero — is the official start of A House By The Park.

Last Minute Agent Antics

So we’re all set to close tomorrow and the real estate agent who was not retained by the seller apparently thinks he is still owed a commission.

Unbelievable.

I presented this agent with a release form to sign (just to be safe) in order to get the 0.5% referral fee that my agent was willing to give him and he won’t sign the release form!

Do I really need him to sign a release form? No, since he has no contract and therefore no claim to any commission, but since I indemnified the seller in order to get the deal done, I want to make 100% sure this is all settled before this agent sees any money at all. If he still has thoughts of raising a stink, he can do so without my money.

What I ended up deciding to do is to close this deal tomorrow, as planned, and have escrow hold this other agent’s 0.5% in escrow until he signs the release. If he doesn’t sign within a couple of weeks, I will just have escrow pay my agent the full commission instead.

I’m not too worried about this situation at this point, but it’s annoying to even have to deal with it. I do like having the power to keep this money in escrow, but honestly, I wish I had the power to withhold all commission related to this deal if I needed to.

This is important: most people don’t realize that the buyer’s agent contract they sign usually specifies that the buyer will be responsible for paying a 3% commission to the buyer’s agent if the seller doesn’t pay it (which they usually do). I do not like this arrangement at all and I will be writing it out of my next contract. I was still going to pay my agent 3%, but I don’t like giving up the right not to under circumstances like an intra-office commission dispute. Another thing people should change about their contracts is the termination clause. My stock contract didn’t allow me to sign on with another agent until three months after I terminated my existing contract. I ended up changing this to 14 days, but I would go even further in retrospect. Probably one week.