Plumbing and HVAC rough-ins complete
The plumbing and HVAC rough-in work is now essentially complete and electrical work has begun. Details of the plumbing and HVAC equipment are available at this previous post, but essentially, the piping, the ducting, and the gas furnace are now all installed. Lots of other stuff, like the heat pump and the fixtures come later.
The crew at Anderson Nesler has done a great job on the HVAC, building an intricate but efficient maze of ducting, and cramming the furnace into a tight crawlspace so as to minimize impact on livable area.
Costs accrued during this stage:
HVAC rough-in | $20,268.00 |
HVAC rough-in | $5,791.00 |
HVAC rough-in | $2,895.00 |
Plumbing rough-in | $1,341.00 |
Plumbing rough-in | $8,048.00 |
Plumbing rough-in | $8,815.00 |
Sewer line video inspection | $130.00 |
Honeybucket rental | $117.00 |