{"id":484,"date":"2009-08-03T23:40:46","date_gmt":"2009-08-04T06:40:46","guid":{"rendered":"http:\/\/www.ahousebythepark.com\/journal\/?p=484"},"modified":"2009-08-19T00:15:36","modified_gmt":"2009-08-19T07:15:36","slug":"garage-pour-complete","status":"publish","type":"post","link":"https:\/\/ahousebythepark.com\/journal\/archive\/2009\/08\/03\/garage-pour-complete\/","title":{"rendered":"Garage Pour Complete"},"content":{"rendered":"<p>During <a href=\"https:\/\/ahousebythepark.com\/journal\/archive\/2009\/07\/31\/deconstruction-complete\/\">deconstruction<\/a>, it became apparent (via cracking) that the existing concrete carport was sitting on a few inches of air. Not good. <a href=\"http:\/\/www.buildllc.com\" target=\"_blank\">Build<\/a> decided, therefore, that it would be best to repour the garage foundation and footings at the same time we did some minor touch-up pouring around other parts of the foundation.<\/p>\n<p>This phase was unexpected and added several thousand dollars to the cost of the project, but the folks at Blackhawk Concrete Construction, R. Leonard &#038; Sons, Island Concrete Cutting, and <a href=\"http:\/\/www.cascadeconcretesawing.com\/\" target=\"_blank\">Cascade Concrete Sawing<\/a> ended up getting it done in only a few days, as framing began in other areas of the house.<\/p>\n<p>There wasn&#8217;t a lot to see on the webcam for this phase of the process because the garage area is blocked by a big metal container, so it will be combined with the framing stage, for timelapse purposes.<\/p>\n<p><img loading=\"lazy\" src=\"\/journal\/wp-content\/uploads\/2009\/08\/garagepour.jpg\" alt=\"\" width=\"620\" height=\"415\" class=\"framed\" \/><\/p>\n<p class=\"caption\">A shot of the garage right before the new concrete was poured<\/p>\n","protected":false},"excerpt":{"rendered":"<p>During deconstruction, it became apparent (via cracking) that the existing concrete carport was sitting on a few inches of air. Not good. Build decided, therefore, that it would be best to repour the garage foundation and footings at the same time we did some minor touch-up pouring around other parts of the foundation. This phase [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[10],"tags":[],"_links":{"self":[{"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/posts\/484"}],"collection":[{"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/comments?post=484"}],"version-history":[{"count":5,"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/posts\/484\/revisions"}],"predecessor-version":[{"id":489,"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/posts\/484\/revisions\/489"}],"wp:attachment":[{"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/media?parent=484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/categories?post=484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ahousebythepark.com\/journal\/wp-json\/wp\/v2\/tags?post=484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}